Project: Cotton End Forest School, Bedfordshire

Sector:

Estimated Value:

Architect: Lungfish

Contractor: Willmott Dixon / Bedfordshire County Council

BIM Level II, new Forest Primary School consisting of an entrance gateway building. This included a hall, kitchen and general admin facilities along with the provision of four pavilion teaching buildings with large open plan central learning spaces and classrooms. The school was designed to be a low energy school utilizing a fabric first approach, mixed mode ventilation strategy and full LED lighting scheme.

Duties: Building Services Performance Specification, including thermal modelling and SBEM.

cotton-end
  • Head Office:
  • 1 Kayes Walk, Lace Market, Nottingham, NG1 1PY
  • T: 0115 684 2167 E: info@bec-consulting.co.uk
  • Copyright© 2020. Built Environment Consulting. All Rights Reserved