The project involved the refurbishment of the current accommodation facility with the introduction of new en-suite accommodation. Our role as an M&E consultant was to survey the existing services and design alterations to the M&E services to suit the new room layouts with en-suites. Other responsibilities included the removal of previous solar thermal and heat pump system and the replacement of a new gas fired boiler plant for heating and hot water generation. This was a challenging project undertaken in phases in an occupied building.
Duties: Full detail design.