Renovation of an old pub into an exclusive high-end hotel.
This was an extremely challenging project as the hotel consists of some six to eight adjoining buildings, all with different floor levels and types of construction, including 16C oak framed construction. Routing of pipework and ductwork took considerable amount of time to get right. A lot of time was spent on site developing the design as new challenges were uncovered as the work progressed.
Duties: Full detail design for the M&E contractor.