Conversion to conference facilities and living accommodation.
The development includes replacement of existing M&E with new high efficiency heating, boosted H&C water, power and lighting.
We were employed to review the suitability of renewable and low carbon energy sources since the remote location of the site does not allow for increasing the electrical load or gas fired heating.
Duties: Full detail design.