New build 4,000m2 bakery and offices. BEC have designed the M&E services strategy for both the base building and to accommodate the production lines. Ventilation being a huge challenge as the client brief was to provide heat recovery from the ovens to heat as much of the factory as practically possible. The roof of the main bakery and the roofs of five smaller food production units on site are designed with a 2,000m2 photovoltaic (PV) system to meet Leicester City Council’s 18% renewables target.
Duties: M&E strategy design and client’s representative for reviewing the M&E contractors detail design drawings and calculations.