Project: Round Wood of Mayfield

Sector:

Estimated Value: £1M

This project was completed on an existing site and consisted of the installation of a new 510kW biomass boiler and plant room to provide heating and hot water to an adjacent warehouse and heating to two kilns for the purposes of drying wood.

BEC provided full mechanical design for the heating system and the biomass boiler all designed to meet the renewable heat incentive requirements. The boiler plant included a 10,000l storage vessel and 14,000l of expansion to meet the higher temperature operating conditions of log kilns. Heating to the warehouse was provided by unit heaters and destratification fans.

Duties: Full detailed mechanical design.

  • Head Office:
  • 1 Kayes Walk, Lace Market, Nottingham, NG1 1PY
  • T: 0115 684 2167 E: info@bec-consulting.co.uk
  • Copyright© 2020. Built Environment Consulting. All Rights Reserved